A 2-week extension to take into account some of the added work (crown moulding, beadboard paneling, complex tile patterns, etc). 

Week 20

Hardwood floors were installed this week! There's a bit of an issue as the floors appear darker than we were expecting (i.e. darker than the sample we were given). The stairs were also stained to match the lighter sample board so there's an inconsistency there (which will likely be fixed). I'm a little disappointed because I love the sample colour and definitely wanted to lean away from dark floors, but they do look great so I guess I can't complain too much.


Office

Hardwood heat registers

Boxes of wood!


Second floor hallway

Sample board on top of the installed floors

At home Steve and I had fun "testing out" our new floors. We dropped all kinds of things on the sample board and left food on overnight. It wasn't great for scratch resistance but it did really well with the stains wiping right off.

Water, lemon juice, ketchup, balsamic vinegar, and honey

Another look at the sample (left) vs. actual (right)
(on top of our current floors)

Other than that, the kitchen/bathroom cabinetry installation has begun. I love love love the kitchen so far; it looks fantastic! Can't wait to see the rest of it come together.



Island gray

Island leg

 
Foyer tile

Dining room
All floors remain covered until construction is complete! 

Gym vinyl floors were installed (see below)


Ensuite cabinetry

Ensuite shower tiling

Remaining baseboards to be installed

It looks like they're preparing to install baseboards and carpets this week, and of course install all the light fixtures I just dropped off over the weekend!